Planned integration

Manufacturing traceability

See how a planned link between AesirX PIM and ComplianceOne could help quality teams find lot, test and shipment evidence from a product record.

Trace a reported issue back to its source
  • Shipment

    Find the finished lot on the dispatch record

  • Lot and specification

    Check the revision and material batch used

  • Inspection and actions

    Review the test evidence and any follow-up

Start with the question a quality team must answer

A distributor reports that a protective insert cracks during transit. The quality team needs to know which finished lot was shipped, what material went into it, and which specification applied when that lot was made. The catalog can show the current product specification. The investigation also needs the historical revision, the test report and the shipment record.

AesirX PIM maintains the catalog record and product documents today. ComplianceOne’s Product Quality and Traceability overlay supports product and lot records, traceability events, quality tests, corrective actions and recall-scope review. The proposed integration would use a shared product reference to help reviewers find relevant ComplianceOne records from the PIM product. The PIM connection is planned. ComplianceOne Product Quality and Traceability

Follow a specification change through production

In this fictional example, an insert switches from one fiber blend to another under a new specification revision. The same product remains in the catalog. The two production runs keep their respective revisions and incoming material lots.

Step Record to retain System or owner
Engineering updates the specification Stable product reference, current dimensions, material and revised technical sheet. Keep the previous approved revision identifiable for historical review. Catalog team maintains the current facts in PIM. Engineering controls the specification history.
Production makes a new run Finished lot, specification revision used, incoming material lot and when the transformation took place. Production or ERP records the run. The receiving team maintains the supplier lot and supporting documents.
Quality reviews the lot Test or inspection report, sample and lot reference, method, result, decision and any follow-up action. Quality owns the decision. ComplianceOne can organize the related tests, findings and corrective actions.
Warehouse dispatches the order Finished lot, shipment and order references, destination and timestamp. Warehouse or ERP records the dispatch. The investigation uses that record to establish what shipped.

Start at the reported shipment and trace back to the finished lot, its material lot and the test report. If an incoming batch is suspected, reverse the investigation and look for other finished lots or shipments that used it. A missing supplier reference stays visible as an evidence gap. The quality team reviews the affected scope and decides what action is warranted. Worked manufacturing evidence example

Define the first handoff narrowly

Start with one product family and match each stable PIM reference to the corresponding ComplianceOne product. Agree who creates the mapping and how a product rename or code change is handled. Keep the production dates and the specification revision on the lot evidence, where they can be reviewed even after the catalog changes. Production, inventory and warehouse systems remain the sources for the events they record.

The first evaluation should prove that someone can follow the reference in both directions: from a PIM product to its ComplianceOne evidence, and from a lot back to the correct product and revision. Check two lots on different revisions and include a missing or ambiguous mapping. Record what an authorized reviewer can see and who resolves exceptions. Compare the time and manual steps with the existing process to see whether the link helps.

Use the ComplianceOne overlay that fits the review

Product quality and traceability

Follow product and lot identifiers through receiving, production and dispatch. Pair an event with its time, source reference and evidence. Article 23 of Vietnam’s Decree 37/2026/NĐ-CP provides traceability data categories and distinguishes system records from the narrower public lookup information. ComplianceOne framework · Decree 37/2026/NĐ-CP

Manufacturing technical regulations

Identify the applicable regulation and version, then keep the test method, sample, result, issuer and conformity decision together. This is a separate review from tracking the physical movement of a lot. Vietnam’s Circular 37/2026/TT-BCT illustrates the need for product-specific scope by amending technical regulations for textiles, fluorescent lamps and paints. ComplianceOne framework · Circular 37/2026/TT-BCT

Extended producer responsibility

Record the packaging category and constituent materials and weights, then identify the responsible entity, reporting period and supporting evidence. Vietnam’s Decree 110/2026/NĐ-CP addresses recycling and waste-treatment responsibilities for producers and importers within its scope. The organization determines the obligations and owns the figures it declares. ComplianceOne framework · Decree 110/2026/NĐ-CP

Bring three records to an integration discussion

Bring a sanitized product specification or field list, a lot and its inspection record, and a dispatch example. Identify the owners of those records and one question you want to answer faster, such as which shipments used an earlier specification. That gives the catalog and quality teams a concrete starting point for assessing the proposed link. Discuss manufacturing traceability

Explore related pages

Manufacturing

Maintain technical product information and explore a planned handoff to ComplianceOne manufacturing evidence.

Product catalog

Structure products with categories, product types and configurable fields that reflect the specifications your teams maintain.

Bring a sanitized catalog sample to your demo

Tell us which products, languages and publishing or review workflows you want to evaluate.