Choose an entry point based on your catalog work
| Team | Common decision | Useful pilot example |
|---|---|---|
| Manufacturing | Which technical fields identify comparable items, and who maintains them? | One packaging family with dimensions, material, images, and supporting documents. |
| Wholesale and distribution | How should catalogs show information received in different formats from suppliers? | Items with different supplier reference formats organized under shared category and field rules. |
| Retail and e-commerce | Which content and media should a shopper see in each store language? | A small localized WooCommerce category with representative products and reviewed images. |
Start with the handoff that causes repeated work
Identify who changes the original information, who checks it, and who needs it next. Follow one product from a supplier sheet or internal specification through the catalog to the buyer-facing page. This gives you a way to evaluate the platform using work the team already does.
Evaluate the wider workflow separately
For commerce, inspect the current store mapping and compare the published page with the product record. For manufacturing evidence, explore how a stable reference could connect PIM and ComplianceOne in the planned integration. The industry pages explain how each workflow starts and where its evidence belongs.
What to include in a pilot sample
For manufacturing, include one approved drawing or specification with a change engineering had to communicate. For distribution, pick two supplier records that use different units for comparable goods. For retail, choose an item whose category card and detail page answer different shopper questions. Include an incomplete record alongside a complete example so each team can demonstrate how it catches missing information.